The soil-structure interaction is a critical part of the design. Performance-based design in earthquake engineering: D3 tends to be too conservative with a huge amount of residual capacity. Federal Emergency Management Agency. Tables 3 to 5 present maximum strains from time-history analyses. Subscribe Enter your email address to subscribe to updates of this page.
Uploader: | JoJogar |
Date Added: | 1 September 2009 |
File Size: | 52.2 Mb |
Operating Systems: | Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X |
Downloads: | 77205 |
Price: | Free* [*Free Regsitration Required] |
Did you find what you were looking for? There are three bents as piers and two bents as abutments.
Therefore, PBD can be a prominent method for future design of bridges. In practice, the interaction between soil and structure is usually simulated by using p-y curves due to its simplicity.
Questions about the collection of email addresses can be directed to the Manager of Corporate WebGovernment Digital Experience Division. Performance Based Seismic Engineering of Buildings": The research of PBD is still in a development stage, with prominent results coming constantly.
Journal of Bridge Engineering 17 5 Engineering Structures 59, Computers and Structures, Inc.
Either single-mode or multi-mode spectral method can be used in this procedure. Log In Sign Up. The following conclusions are made from cnbdc study.
The second limitation of FBD is force-reduction factor R, which is utilized to scale down the seismic force. Bulletin of Earthquake Engineering 8 4 Performance Assessment Pcf On Time-History Analysis After designing the bridge based on three different approaches, time-history analyses were carried out to evaluate their seismic performance.

Table 6 shows the damage states cjbdc the three designs determined from average strains of time-history analysis. There are many applications of PBD in large projects aiming to reduce the uncertainty of the designs Marsh and Stringer, Case Study Description The case study presents a multi-span concrete bent bridge, which is categorized as a regular Major Route bridge.
Volume 1 - Supplement to CHBDC S6-14
You're using an out-of-date version of Internet Explorer. In the xhbdc phase, the bridge model was built in SAP CSI, and the soil-structure interaction was simulated by using a series of linear p-y springs.
Volume 6 - Hydrotechnical Engineering. In the tables only the results from the first 3 earthquake records are shown. Remember me on this computer. The third limitation is that design seismic force is applied to the structures with unchanged stiffness, which indicates that the elements of the structure are subjected to yield pdff the same time.
Utilizing one R factor for different elements may not be appropriate. A typical p-y curve is shown in Figure 3, where the soil loses both strength and stiffness with the increase of displacement. PBD relates scientific designs with performance explicitly so that decision makers cnbdc better distribute investments. Although there are many performance criteria in CHBDCthis study is only based on strain criterion.
Volume 1 - Supplement to CHBDC S - Province of British Columbia
It should be noted that although a conservative structure is more likely to protect life safety, a good design does not mean to be extremely conservative. Site-specific response spectra were used for the design, cubdc the spectra accelerations are shown in Figure 2. Thank you for your response. Tables 3 to 5 present maximum strains from time-history analyses. However, avoidance of any yielding may be difficult. Skip to main content.
Comments
Post a Comment